-
Building Infrastructure
-
Trade Specific Infrastructure
-
Electric Power Supply
<
>
S No. | Construction Type | Area(Sq.mt.) |
---|---|---|
1. | Total Area | 4951 Sq. Mtr |
2. | Covered Area | 2775 Sq. Mtr |
3. | Principal Room | 18.07 Sq. Mtr |
4. | Office Area | 55.27 Sq. Mtr |
5. | Total Class Rooms Area | 410.93 Sq. Mtr |
6. | Total Workshops Area | 936.28 Sq. Mtr |
7. | Drawing Room | 46.82 Sq. Mtr |
8. | Audio-Visual Room | 96.99 Sq. Mtr |
9. | IT Lab. | 47.80 Sq. Mtr |
10. | Library | 34.54 Sq. Mtr |
10. | Play Area | 94 Sq. Mtr |
S No. | Name of Trade | Required as Per DGT norms (Sq.mt.) | Actually available (Sq.mt.) | Class Room Required as Per DGT norms (Sq.mt.) | Class Room 1 Actually available (Sq.mt.) | Class Room 2 Actually available (Sq.mt.) |
---|---|---|---|---|---|---|
1. | Mechanic Motor Vehicle | 210.00 Sq. Mtr | 302.20 Sq. Mtr | 25.00 Sq. Mtr | 46.82 Sq. Mtr | 34.52 Sq. Mtr |
2. | Mechainc Refrigeration & Air Condition | 80.00 Sq. Mtr | 156.00 Sq. Mtr | 25.00 Sq. Mtr | 46.82 Sq. Mtr | 30.79 Sq. Mtr |
3. | Electrician | 98.00 Sq. Mtr | 98.00 Sq. Mtr | 25.00 Sq. Mtr | 47.30 Sq. Mtr | 47.14 Sq. Mtr |
4. | Electronics Mechanic | 56.00 Sq. Mtr | 65.00 Sq. Mtr | 25.00 Sq. Mtr | 46.82 Sq. Mtr | 37.21 Sq. Mtr |
5. | Computer Operator & Programming Assistant | 70.00 Sq. Mtr | 88.00 Sq. Mtr | 25.00 Sq. Mtr | 46.82 Sq. Mtr | ----- |
6. | Physiotherapy Technician | 100.00 Sq. Mtr | 129.00 Sq. Mtr | 25.00 Sq. Mtr | 25.00 Sq. Mtr | 25.00 Sq. Mtr |
S No. | Current Electric Status | (In KW) |
---|---|---|
1. | Date of Connection | 13/02/2004 |
2. | Connection in the Name of | Sri Guru Harkrishan ITC |
3. | Meter No. | 27105201 |
4. | Current Electricity Load. | 33.00 KW |